Amrit Academy

Consulting

JOB PROSPECT & MARKET

Application of Passive fire protection (PFP) requires good understanding of various Building Codes, local regulatory manual, the fire protection elements of a facility, test standards of PFP , certification bodies of tested designs, applicability of tested designs and control parameters of installation for compliance. Hence the task is not only complex but involve higher cost unless the requirement of PFP are not taken care at various stage of a project, starting from design stage.

consulting img

Service to new Applicator

check mark

Business opportunity in zone

check mark

Design assistance

check mark

Project planning

check mark

Training of application

check mark

Inspection

PFP service areas

check mark

Structural fire proofing

check mark

Firestop sealing

check mark

Compartmentation

check mark

Opening Protection

Service to PMC & Architects

img con inner1 removebg preview

Field test associated with fire proofing

Construction Stage

  • Selection of Steel Structural members for optimizing cost,
  • Size and distribution of MEP penetrations opening and routing.
  • Comparmentation design.

Construction Stage

  • Substrate preparation for fireproofing.
  • Defining MEP penetration positions in opening.
  • BOQ preparation
  • Helping in process of RFQ.
  •  

Third Party Inspection

  • Deployment of trained inspector
  • Quality control of inspection.
  • Compliance of control parameters

Get In Touch With Us

gall 1 1024x246 removebg preview

Kick-off meeting at site

Training

Designing

Inspection